Establishment and growth period from 1998 to 2017
-
1998
- 12Established KOCEN Co., Ltd. as a spin-off from KEPCO E&C
-
1999
- 01Transferred KEPCO E&C work to KOCEN and engineering business entity registration
-
2001
- 02Uljin Laboratory accredited to ISO/IEC 17025 by Korea Laboratory Accreditation Scheme(KOLAS)
-
2002
- 07Quality Surveillance Department accredited to ISO/IEC 17020 by KOLAS
-
2003
- 01Awarded a contract for Concrete test project for Shin-Kori 1, 2 NPPs
- 04Awarded contracts for Quality surveillance and Documents control projects for Shin-Kori 1, 2 NPPs
- 04Awarded a contract for Quality surveillance project for Shin-Wolsong 1,2 NPPs
- 10Awarded a contract for Concrete test project for Shin-Wolsong 1,2 NPPs
-
2004
- 06Moved headquarter to KrantzTechno Building in Seongnam city near Seoul
-
2007
- 01Awarded contracts for Quality surveillance and Documents control projects for Shin-Kori 3,4(Saeul 1,2) NPPs
- 05Awarded a plaque of appreciation of KHNP for Document control project for Shin-Kori 1,2 NPPs
- 10Awarded a contract for Concrete test project for Shin-Kori 3,4(Saeul 1,2) NPPs
- 10Awarded a prize of excellent subcontractor of KEPCO E&C
-
2008
- 12Awarded a prize of the best subcontractor of Incheon International Airport for information security
-
2009
- 12Awarded a contract for Quality surveillance project for Shin-Hanul 1,2 NPPs
-
2010
- 03Awarded a contract for Concrete test project for Shin-Hanul 1,2 NPPs
- 04Awarded a contract for Document control project for Shin-Hanul 1,2 NPPs
- 10Integrated by TÜV SÜD AG
- 11Awarded a contract for Document control project for UAE Barakah NPPs
- 12Awarded a contract for Quality surveillance project for UAE Barakah NPPs
-
2011
- 05Awarded a contract for Concrete test project for UAE Barakah NPPs
- 11Awarded a contract for Non-seismic piping design engineering project for UAE Barakah NPPs
- 12Acquired corporate credit rating of A+
- 12Acquired TÜV SÜD GNEC
-
2012
- 11Awarded a contract for Construction technical support project for Shin-Hanul 1,2 NPPs
- 12Awarded contracts for Quality surveillance projects for Taean and Dongducheon thermal power plants
-
2015
- 08Awarded a prize by Ministry of Trade Industry and Energy(MOTIE) for Rad-waste disposal facility concrete test project
- 09Awarded a contract for Concrete test project for Shin-Kori 5,6(Saeul 3,4) NPPs
- 10Awarded a contract for Document control project for Shin-Kori 5,6(Saeul 3,4) NPPs
-
2016
- 02Awarded a plaque of appreciation of KEPCO for UAE Barakah NPP 1 project
- 08Awarded a contract for Quality surveillance project for Shin-Kori 5,6(Saeul 3,4) NPPs
- 11Awarded a contract for Concrete test project for Stage 2 rad-waste disposal facility
- 12Awarded a contract for Piping design engineering project for Shin-Hanul 3,4 NPPs
-
2017
- 02Awarded a contract for Quality surveillance of steam generator replacement for Hanbit 5,6 NPPs
- 03Awarded a contract for Construction quality surveillance project for Shin-Kori 5,6(Saeul 3,4) NPPs
From 2018 to the present, DK KOCEN 'The Second Leap Period'
-
2018
- 07Changed KOCEN shareholder to DK Engineering Dr. Young-ha Lim inaugurated as the 8th CEO
- 12Celebrated the 20th anniversary of founding, declaring the vision of 'The Second Leap Period' with DK Engineering
- 12Awarded a contract for 2018 Mechanical design engineering project of operating NPPs
-
2020
- 02Awarded a contract for 2019 Mechanical design engineering project of operating NPPs
- 11Awarded a contract for NPP decommissioning hot cell design research
-
2021
- 04Awarded a plaque of appreciation of KEPCO E&C for UAE Barakah NPP 1 project
-
2022
- 05Awarded contracts for Concrete test and Quality surveillance projects for export new types of research reactor
- 08Awarded a contract for commercialization research for reactor control system and digital I&C
- 12Awarded a prize by Ministry of Trade Industry and Energy(MOTIE) for Shin-Hanul 1 project
- 12Opened a concrete test lab. for export new types of research reactor and self-owned factory in Busan
- 12Registered as a provider of KHNP safety related Q class for operating NPPs overall design engineering
-
2023
- 03Awarded a contract for Concrete test project for Shin-Hanul 3,4 NPPs
- 07Awarded a contract for Document control project for Shin-Hanul 3,4 NPPs
- 09Awarded a contract for Document control project for Egypt El-Dabaa NPPs
- 09Awarded a contract for 2023 Mechanical design engineering project of operating NPPs
- 11Awarded a contract for Quality surveillance for ARA research reactor
Industry accreditations
- • Quality Management System according to ISO 9001 : 2015 by Orion Registrar
- • Health Safety Management System according to ISO 45001 by AK Registrars
- • International authorized testing laboratory according to ISO / IEC 17025 certified by KOLAS
- • National authorized inspection body according to ISO / IEC 17020 certified by KOLAS
- • Engineering business registration by KENCA
- • Overall design business of the power technology management Act by KEEA
- • Certified design engineering vendor by KEPCO E&C
- • Qualified provider of overall, mechanical, structural, electrical and I&C design engineering Q class by KHNP
- • Qualified Nuclear Approved Supplier by Nawah of UAE
- • Construction engineering service registration by Governor of Gyeonggi Province
- • Specialized fire protection design service by Governor of Gyeonggi Province
- • Dispatched worker business by Ministry of Labor
- • Software business registration by KOSA
- • Certificate of Small & medium sized enterprise by SMEs
- • Main Biz Small & medium sized enterprise by SMEs
- • Certificate of Trade Business by Korea International Trade Association
- • Certified R&D Center by KOITA
- • 28 registered patents related to power generation facility